Our Projects
Our Projects
Latest Construction Works
Explore the latest house plans and building costs for constructing homes in Kenya during 2023. These plans provide diverse choices for crafting your dream home, whether it’s in a city or countryside. Take a look at the affordable rates to discover the ideal design that suits your budget and requirements.
A-FRAME
Naivasha, Kenya
2 BEDROOM
Naivasha, Kenya
4 BEDROOM
Matuu, kenya
3 BEDROOM
Kisumu, Kenya
4 BEDROOM
Eldoret, Kenya
2 BEDROOM
Matuu, Kenya
3 BEDROOM
Kikuyu, Kenya
Food Lab Building
Nakuru, kenya
Our 2023 collection includes updated house plans offered at prices fitting various tastes and budgets. Whether you prefer a modern or traditional style, there are options that won’t strain your finances while helping you create your dream home. Dive into our selection of budget-friendly choices and begin envisioning your perfect living space today.
A-FRAME
Kisii, Kenya
A-FRAME
Baringo, Kenya
A-FRAME
Naivasha, Kenya
AIRBNB
Nakuru, kenya
Trust and Worth
Our Clients
Frequently Asked Questions
To construct a house in Kenya, you need several key things:
Find Land: Search for a suitable piece of land where you can build your house.
Determine Financing: Decide how you will finance the construction. This could involve savings, loans, or other financial arrangements.
Choose Size and House Design: Select the size of the house and a design plan that fits your needs and preferences.
Hire Experts: Engage the right professionals such as an architect, quantity surveyor, electrical engineer, construction engineer, and interior designer to assist you.
Build the House: Use the gathered information and professionals to start constructing your house.
Â
A basic mabati house structure costs about Ksh 350,000 plus additional expenses for finishing. For a 2-bedroom house, you’ll need around Ksh 700,000. And for a 3-bedroom house, budgeting approximately Ksh 1 million should suffice.
The way your home looks affects how long it takes to build. Custom homes usually take around 10 to 16 months, whereas personalized production plans take about four to six months.